Besser Block 150 Full

Vendor Builders Mitre 10

For optimal results when working with

masonry blocks

, it is crucial to ensure that the blocks are dry before laying them in the wall. This practice helps to minimize subsequent shrinkage. Additionally, it is important to keep mortar off the face of the blocks and clean off any droppings as work progresses, before the mortar sets. Whenever possible, avoid cleaning down with acid.

When it comes to color consistency, care should be taken to order enough product to complete the project at the same time to avoid batch variations.

Concrete Masonry

blocks behave differently from clay bricks in terms of moisture movement and temperature changes. Assuming sound foundations are provided, cracks in walls can be avoided by the correct use of control joints, bond beams, and/or joint reinforcement. The rules for using these elements are contained in Australian Standard 3700-2011.

For useful estimating data, blocks with a 390x190mm face equate to 12.5 units per square meter and 2.5 units per linear meter. To fill 200mm bond beams, allow 0.013m

3

of concrete per linear meter of beam. To core fill 150mm ‘H’ blocks, allow 0.65m

3

of concrete per 100 blocks. To core fill 200mm blocks, allow 0.8m

3

of concrete per 100 blocks. To core fill 200mm ‘H’ blocks, allow 0.84m

3

of concrete per 100 blocks. To core fill 300mm blocks, allow 1.1m

3

of concrete per 100 blocks. To core fill 300mm ‘H’ blocks, allow 1.32m

3

of concrete per 100 blocks.

Features

Ensure blocks are dry before laying to minimize shrinkage.

Order enough product at once to avoid batch variations.

Follow Australian Standard 3700-2011 for control joints and reinforcement.

$3.75
Delivery Options
2hrs. Delivery Within 2 Hrs.
3hrs. Delivery Within 3 Hrs.
4hrs. Delivery Within 4 Hrs.
6hrs. Delivery Within 6 Hrs.